Warning: ftp_fget() expects parameter 1 to be resource, null given in /www/wwwroot/en.donglingtech.com/wp-admin/includes/class-wp-filesystem-ftpext.php on line 146

Warning: ftp_fget() expects parameter 1 to be resource, null given in /www/wwwroot/en.donglingtech.com/wp-admin/includes/class-wp-filesystem-ftpext.php on line 146
POWER AMPLIFIER SERIES – Suzhou Dongling Vibration Test Instrument Co., Ltd.

Scan and follow WeChat public platform

Scan the QR code to follow the WeChat public account

Product service

POWER AMPLIFIER SERIES

POWER AMPLIFIER SERIES

  • 微信或QQ扫一扫

The Smart Power amplifier is composed of the logical unit,power unit and control unit and has the advantages of omtelligent manipulation,stability,reliability,flexible configuration, effcient and energy saving, compact structure and easy maintenance.

Performance Characteristics

Hardware and software dual protection, output force limit, linage protection and additional customized protections based on user requirements.

Easy to use interface, modular system design, easy operation, multi-language switching and authority management

All digital debugging, low harmonic distortion, excellent current sharing effect and multi-node monitoring.

System self-diagnosis, fault log and power unit adopts N+1 mode parallel operation Test security.

External connection to industrial module, customized multimedia, running log, self protection built in and platform optimization.

Technical Specifications

excel转html by toolscat.com
Power range 0.1~1000kVA
Output voltage 120Vrms(rated), 150Vrms(max.)
Input impedance >10kQ
Signal-to-noise ratio >65dB
Harmonic distortion (resistive load) < 1.0% (typical value)
Output voltage measurement error <1%
Output current measurement error <1%
Output current <4800A( 120A step increase)
Output current crest factor >3
Peak power of the module unit >150%(20kVA)
DC stability Output terminal zero drift <50mv/8h
Frequency response DC ~ 5000Hz ±3dB
Medium-frequency gain >80
DC / AC conversion efficiency >95%
Nature of the load Optional of resistive,capacitive,inductive
Parallel operation current unbalanceness <1%

Optional Functions

The unattended operation function is extremely useful when performing a long duration reliability test. The user has the ability to track the equipment operating status and also has the ability to view and report the status in real time through sms (short message service) based on the parameters set by the user. This relieves the technician of the need to be present at all times and reduces labor costs while still maintaining real time monitoring.

Collect and store the system historical alarm information and key historical data in accordance with the user requirements . This function also provides the ability to view the historical data in real time for analysis by the user

The user can select the optimal excitation level and power unit configuration related to the power needs of the actual test in order to save energy costs.

Authority to operate the test system can be set to different levels depending on the laboratory requirements. Implementation of authority levels helps to protect the specimen and the test equipment as well as maintain control and safety standards in the laboratory. Authorization levels can be set for different functions and operations of the test system.

Rea卜time communication with the power amplifier is achieved via an Ethernet connection. This connection allows the user to perform remote control operations from more than 1 kilometer away from the system. In addition the connection provides the user with an interface to retrieve relevant information from the power amplifier as well as acquire data and perform analysis of the power amplifier.

The user can set the system automatic shutdown process to begin upon completion of the test. In addition, the time management function provides the ability to view accumulated time data in real time which is convenient for scheduling and planning.

The maximum system force can be limited in real time by adjusting the system force limit parameters. Different limits can be set for each test profile. This feature can prevent large sudden force from the shaker due to external reasons that might damage the shaker or the specimen

Combined centralized control can be performed with other third party equipment such as a temperature chamber. This control capability provides the ability to assure the test parameters and safety requirements related to the environmental testing are consistent with test requirements. The centralized control can be achieved through a variety of flexible control modes (for example: hardware interlock control, 485 bus control or Ethernet) depending on the third party equipment requirements.

The self-test source function provides failure source information in the event a problem occurs during the test process and a failure stops the test. This function does not require additional equipment.

产品服务信息